Australian National Electrcity Market (NEM) Model – ISP Submissions
EPC has undertaken extensive modelling of the AEMO Draft 2022 ISP that was released in December 2021.
Download a copy of the initial EPC submission on the ISP here: ISP Submission1
Download a copy of the supplementary EPC submission on the ISP here: ISP Supplementary Submission
******************************************************************************************
Reliable and Affordable Electric Power Generation Booklet
This report is based on modelling undertaken with the EPC NEM generation mix model. Download a copy of the 4 page “Reliable and Affordable Electric Power Generation” booklet here: Booklet
Contributing Authors:
Dr Robert Barr AM BE(Hons) ME PhD FIE(Aust) CPEng , Director Electric Power Consulting Pty Ltd
Barry Murphy BScApp, BE(Chem) CSci MBA FIChemE FTSE FAICD, Former Chairman & CEO Caltex Australia
Dr Mark Ho PhD, President Australian Nuclear Association
Martin H Thomas AM FTSE HonFIEAust HonFAIE
Barrie Hill BE MiMechE MIPENZ FIE(Aust), Managing Director SMR Nuclear Technology Pty Ltd
******************************************************************************************
EPC Work on the Finkel Review of June 2017
In 2017, EPC undertook a review of the “Independent Review into the Future Security of the National Electricity Market” (Finkel Report ). EPC made recommendations for improvements to the report in the EPC report titled “How to Make the Finkel Electricity Plan Work”. The EPC report can be downloaded from this link.